Back-of-envelope estimation

From your world. Sizing the commerce mart; translating 'bytes scanned' into an Athena bill; capacity-planning a feed

1. "Size a pipeline for 5 PB/year. Where do you start?"

Model answer. I start from throughput and work up. Suppose it is 2M events/sec at ~100 bytes each. That is 2e8 B/s = 200 MB/s raw. Over a year (~3.15e7 s) that is ~6.3 PB raw.

Then I apply the two assumptions that really move the number:

  • Columnar compression (~3× down → ~2.1 PB).
  • Replication for durability (~3× up → ~6.3 PB on disk).

So "5 PB/year" is the right ballpark. I would say out loud: "assuming 100 B/event, 3× compression, 3× replication." If you change any of these, the number changes. That is the reason to state them.

2. "A stakeholder asks what a query will cost on Athena. How do you answer?"

Model answer. Athena bills per TB scanned. So cost = $/TB-scanned × TB_scanned. The price is roughly $5/TB at the time of writing.

The lever is TB_scanned:

  • Store Parquet and select only the needed columns. This cuts TB_scanned (column pruning).
  • Use partitioning and sort order. Then the engine skips row groups and files for selective filters (FND-06).

I would estimate the scanned bytes from the columns and partitions that the query touches, not from the full table. I would give a range and state the assumption.

3. "How much to retain this feed for 7 years?"

Model answer. This is storage cost, not query cost: GB_stored × $/GB-month × months. Take the stored bytes/year (raw × compression × replication). Convert them to GB. Multiply by 7 × 12 months and by the $/GB-month rate.

I would flag that the compression and replication assumptions dominate. I would also flag that lifecycle tiering can cut the cost of the later years substantially. Lifecycle tiering moves old data to colder, cheaper storage. It is worth mentioning for a 7-year SOX retention.

4. "Why not just load-test instead of estimating?"

Model answer. The estimate decides whether the design is worth building and load testing. A sixty-second envelope tells me these things:

  • Is this a one-box DuckDB job or a cluster?
  • Is the Athena bill $100 or $100k?
  • Does it fit in RAM?

Load testing is expensive. It comes after the envelope narrows the options. The job of the estimate is the right order of magnitude with assumptions that people can challenge. Load testing then refines the design that remains.